Our Projects

Engineering Projects

At BES, we turn complex engineering challenges into practical, high‑performance solutions. Since 2016, we have successfully delivered diverse projects across Pakistan, serving industrial, commercial, and infrastructure sectors. Our project portfolio reflects our technical capability, disciplined execution, and commitment to quality. From planning to commissioning, we ensure every project meets strict safety standards, technical specifications, and client expectations.

Project Portfolio

Solar installations and lift systems delivered with disciplined execution, safety, and long-term reliability.

Elevators

5000kg Cargo Lift Installation

Lahore, Pakistan

BES installed a 5000kg cargo lift in Lahore, Pakistan, engineered to handle heavy-duty material transportation with efficiency and safety.

The lift system was designed to support high load capacity requirements while maintaining operational stability and durability.

Our technical team ensured accurate installation and strict adherence to engineering standards to guarantee reliable performance under demanding industrial conditions.

Project Highlights

  • 5000kg heavy-duty capacity
  • Stability & durability under load
  • Strict engineering standards & safety
Elevators

1000kg Passenger Lift Installation

Model Town, Multan

BES successfully supplied and installed a 1000kg passenger lift at Model Town, Multan.

Designed to accommodate 10–12 persons, the lift system provides efficient and reliable vertical transportation for high-traffic usage.

Our engineering team ensured precise installation, structural stability, and strict adherence to safety standards to guarantee smooth operation and long-term durability.

Project Highlights

  • 1000kg (10–12 persons)
  • High-traffic reliability
  • Structural stability + safety standards
Power

200 kVA Cummins Generator Testing & Commissioning

Pakistan

BES successfully carried out the testing and commissioning of a 200 kVA Cummins generator, ensuring reliable power delivery and operational efficiency.

The project involved detailed pre-commissioning inspections of both mechanical and electrical components, followed by comprehensive system verification and testing under multiple load conditions.

The generator demonstrated stable and smooth performance, with all safety shutdown mechanisms properly implemented and validated, ensuring full compliance with required operational standards.

Project Highlights

  • 200 kVA Cummins generator commissioning
  • Pre-testing inspection of mechanical & electrical systems
  • Load testing under multiple operating conditions
  • Safety shutdown systems implementation & compliance verification
Solar

110kW Solar System Installation (Hybrid)

Pakistan

BES successfully designed and installed a 110kW hybrid solar power system, delivering a high-capacity and energy-efficient renewable solution.

The system consists of 179 Jinko 615W solar panels, providing strong generation capability to meet substantial energy demands.

To ensure advanced energy management and seamless hybrid functionality, four 30kW Fox HV hybrid inverters were installed, enabling efficient power conversion and intelligent load handling.

Project Highlights

  • 110kW hybrid system
  • 179 × Jinko 615W panels
  • 4 × 30kW Fox HV hybrid inverters
Escalators

Escalator Commissioning and Testing

Pakistan

BES successfully executed the complete commissioning process for an escalator system, ensuring full operational readiness and safety compliance.

Our engineering team conducted a detailed mechanical assessment of step chains, drive mechanisms, and overall structural performance, alongside comprehensive electrical testing of control panels and integrated safety systems.

All critical safety components, including emergency stop mechanisms and braking systems, were rigorously tested, along with load performance, speed calibration, and directional accuracy to guarantee reliable and safe operation.

Project Highlights

  • Complete escalator commissioning and system validation
  • Mechanical inspection of step chains & drive systems
  • Electrical testing of control panels & safety mechanisms
  • Load testing, speed calibration & directional accuracy verification
Mechanical

Passenger Elevator (800 KG) Installation & Commissioning

Pakistan

BES completed the installation, testing, and commissioning of an 800 KG capacity passenger elevator, ensuring safety, comfort, and operational reliability.

The scope of work included precise shaft preparation, mechanical installation of the traction system and cabin, along with advanced control system configuration.

The elevator was rigorously tested for load performance and safety compliance, delivering smooth, quiet operation with accurate floor leveling for enhanced passenger experience.

Project Highlights

  • 800 KG passenger lift installation & commissioning
  • Traction system & cabin mechanical installation
  • Advanced control system configuration
  • Smooth operation with precise floor leveling & safety compliance
Elevators

630kg Passenger Lift Installation

Royal Orchard, Multan

BES supplied and installed a 630kg semi-imported passenger lift at Royal Orchard, Multan.

Designed to accommodate 6–8 persons, the lift ensures smooth and safe vertical transportation.

Our technical team executed the installation with precision, maintaining strict engineering standards to ensure durability, safety compliance, and long-term operational reliability.

Project Highlights

  • 630kg capacity (6–8 persons)
  • Safety compliance & durability focus
  • Precision installation & alignment
Solar

70kW Solar System Installation (On-Grid)

Pakistan

BES successfully installed a 70kW on-grid solar power system designed to deliver efficient and stable energy generation.

The system operates with a 40kW Sunways on-grid inverter, ensuring reliable grid synchronization and consistent performance.

To enhance operational control and efficiency, two INVT Variable Frequency Drives (37/45kW) were integrated into the system.

Project Highlights

  • 70kW on-grid system
  • 40kW Sunways on-grid inverter
  • Two INVT VFDs (37/45kW)
Elevators

630kg Passenger Lift Installation

Brand Road, Alkaram Center, Multan

BES successfully supplied and installed a 630kg semi-imported passenger lift at Brand Road, Alkaram Center, Multan.

Designed to accommodate 6–8 persons, the lift ensures smooth and reliable vertical transportation within the facility.

Our team executed the installation with precision, focusing on structural alignment, safety compliance, and long-term operational performance. This project reflects BES’s commitment to delivering dependable mechanical solutions with professional workmanship.

Project Highlights

  • 630kg capacity (6–8 persons)
  • Structural alignment + safety compliance
  • Reliable operation in a busy facility
Elevators

630kg Passenger Lift Installation

9th Arcade, Multan

BES installed a 630kg passenger lift at 9th Arcade, Multan, designed to accommodate 6–8 persons.

The lift system was implemented with a strong focus on safety, operational efficiency, and structural precision.

Our team ensured proper alignment and technical compliance to deliver reliable and long-lasting vertical transportation.

Project Highlights

  • 630kg (6–8 persons)
  • Safety + operational efficiency
  • Alignment & technical compliance
Solar

50kW Solar Power System

Pakistan

BES successfully designed and installed a 50 kW on-grid solar power system, delivering a high-efficiency renewable energy solution.

The system comprises 82 JA 610W solar panels with a total generation capacity of 50,020 watts. A Sunways 50kW on-grid inverter was installed to ensure seamless grid synchronization and stable performance.

Our team engineered a durable 14-gauge elevated steel structure to maximize sunlight exposure and provide long-term structural strength. Additionally, a 45/55kW Variable Frequency Drive (VFD) was integrated to optimize system efficiency and operational control.

Project Highlights

  • 82 × JA 610W panels (50,020W total)
  • Sunways 50kW on-grid inverter
  • 14-gauge elevated steel structure + 45/55kW VFD
Solar

46kW Solar Power System

BCG Chowk, Multan

BES successfully designed and installed a 46kW on-grid solar power system at BCG Chowk, Multan.

The system comprises 76 high-efficiency 610W Canadian solar panels, generating a total capacity of 46,360 watts. To ensure optimal grid integration and performance stability, we installed two 20kW Solis on-grid inverters, enabling efficient load distribution and smooth energy conversion.

Our team constructed a beautifully engineered elevated mounting structure to maximize sunlight exposure while ensuring long-term structural durability.

Project Highlights

  • 76 × 610W Canadian Solar panels (46,360W total)
  • Two 20kW Solis on-grid inverters for load distribution
  • Elevated mounting structure for exposure & durability

Ready to Transform Your Infrastructure?